Measure:
Conversion work at the Quierschied community school GemS
Streets:
Sebastian-Bach-Straße, Josef-Haydn-Straße, Im Eisengraben
Executing construction company:
VSV SIG GmbH
Restriction:
Absolute parking bans with the addition: Monday-Saturday in the period from 07:00 to 17:00 increased truck traffic in the affected streets
Period:
From 16.07.2026
Measure:
Road surface repair
Streets:
L 247 Heusweiler Straße
Executing construction company:
State Highway Authority
Restriction:
The closed section includes the sections access to the primary school/sports field, junctions “Zu den Eichenstangen” and “Am Gumbert”
Detour:
A corresponding detour is signposted
Period:
From 27.07.2026
Measure:
Renewal of drinking water pipes
Streets:
Bodelschwinghstraße - from junction Johannisstraße to the end of Bodelschwinghstraße
Executing construction company:
HTB Baugesellschaft mbH
Restriction:
Partial road closure with double-sided parking ban in the construction area
Period:
23.03.2026 expected until 21.08.2026
Measure:
Installation of a protective scaffolding with protective net above the roadway - overhead line construction
Streets:
L 128 Hauptstraße - outside the town
Executing construction company:
E.E.R. Harald Lück
Restriction:
Temporary speed reduction
Period:
10.05.2026 expected until 30.08.2026
Measure:
Work on the district heating pipeline
Streets:
Ahornweg as well as Ober den Stangen
Executing construction company:
ENROTEC Versorgung GmbH & Co.KG
Restriction:
Closure of the sidewalk
Period:
01.07.2026 expected until 31.07.2026
Measure:
Work on a hydrant
Streets:
Wilhelm-Busch-Str. 2
Executing construction company:
Karl Werhann GmbH
Restriction:
Closure of the sidewalk
Period:
20.07.2026 expected until 24.07.2026
The listing includes construction measures that were communicated to the administration early and before the deadline for submission to the Quierschied Anzeiger. Short-term road openings due to pipe failures or emergency measures often cannot be published in time. For questions regarding the construction measures, please contact the respective project owner. We ask for your understanding of the resulting traffic disturbances.