Due to construction work related to the expansion of the fiber-optic network, there will be a temporary full closure in Aschbach between November 25 and 29, 2024, in the area of the street "Auf dem Stein" (house numbers 20 to 22 and 25 to 28), as some of the work is being carried out using open construction methods.
For the same reason, there will be disruptions at Flurstraße 18 and Hohlstraße 12 to 13. The residents will be informed about the exact dates by the construction company Selectra FttH GmbH.